| Site Allocations (Homes & Jobs) DPD: Preferred Options | |
| Vol. 1: Harrogate town (North East) (8.2Mb) | Vol. 8: Masham (4.6Mb) |
| Vol. 2: Harrogate town (South East) (4.7Mb) | Vol. 9: Pateley Bridge (3.7Mb) |
| Vol. 3: Harrogate town (South West) (5.9Mb) | Vol. 10: Group B Villages (Birstwith - Follifoot) (3.2Mb) |
| Vol. 4: Harrogate town (North West) (4.8Mb) | Vol. 11: Group B Villages (Grn Hammerton - Kirkby Malzeard) (9.4Mb) |
| Vol. 5: Knaresborough (4.8Mb) | Vol. 12: Group B Villages (Long Marston - Tockwith) (8.9Mb) |
| Vol. 6: Ripon (8.5Mb) | Vol. 13: Group C Villages Part 1 of 2 (9.9Mb) |
| Vol. 7: Boroughbridge (3.7Mb) | Vol. 13: Group C Villages Part 2 of 2 (2.0Mb) |
| Sustainability Appraisal (SA) to the above Report | |
| SA: Main Report (605kb) | SA: Appendix 5e: Appraisal of Options for Knaresborough (486kb) |
| SA: Appendix 1: consultees (141kb) | SA: Appendix 5f: Appraisal of Options for Ripon (686kb) |
| SA: Appendix 2: Review of Plans, Programmes & Objectives (172kb) | SA: Appendix 5g: Appraisal of Options for Boro'bridge, Masham & Pateley Bridge (654kb) |
| SA: Appendix 3: Summary of Baseline Position (113kb) | SA: Appendix 5h: Group B villages (651kb) |
| SA: Appendix 4: Aims, Objectives & Indicators (116kb) | SA: Appendix 5i: Group B villages (548kb) |
| SA: Appendix 5a: Appraisal of Options for Harrogate Town NE (592kb) | SA: Appendix 5j: Group B villages (486kb) |
| SA: Appendix 5b: Appraisal of Options for Harrogate Town SE (292kb) | SA: Appendix 5k: Group C villages (621kb) |
| SA: Appendix 5c: Appraisal of Options for Harrogate Town SW (248kb) | SA: Appendix 6: Appraisal of Preferred Options (1.1Mb) |
| SA: Appendix 5d: Appraisal of Options for Harrogate Town NW (310kb) | |
| draft Strategic Housing Land Availability
Assessment (SHLAA) Part 1 of 6
(8.6Mb) draft Strategic Housing Land Availability Assessment (SHLAA) Part 2 of 6 (7.7Mb) draft Strategic Housing Land Availability Assessment (SHLAA) Part 3 of 6 (6.2Mb) draft Strategic Housing Land Availability Assessment (SHLAA) Part 4 of 6 (6.4Mb) draft Strategic Housing Land Availability Assessment (SHLAA) Part 5 of 6 (8.6Mb) draft Strategic Housing Land Availability Assessment (SHLAA) Part 6 of 6 (8.1Mb) |
draft Flood Risk Sequential Test (375kb) |
| Site Options for New Homes & Business |
Covering Report (940kb)(to be read in conjunction with one or
more parts of the following appendices, A-D, which contain maps of site options:) |
|
| List of site options |
A full list of
suggested site options (30kb) across the District, to help
you find out where they are located and |
|
| Appendix A to above | Site option maps in Harrogate (9.7Mb), Knaresborough (2.6Mb) & Ripon 5.1Mb) each with site appraisals. | |
| Appendix B to above | Site option maps in Boroughbridge
(1.9Mb), Masham
(1.1Mb), Pateley
Bridge (820kb) each with site appraisals. Also larger villages maps (1.7Mb) (*nb in these settlements, the Council also consulted parish councils to review Development Limits, areas for protection and to identify small areas of land suitable for building affordable housing for local people. Residents and interested parties were invited to get involved by contacting their parish council or emailing Harrogate Borough Council. *) |
|
| Appendix C to above | Site option maps in smaller villages (4.1Mb) (Also see the text between asterisks * * in the cell above) | |
| Appendix D to above | Other site option maps (5.0Mb) | |
It was also recommended that Accessibility criteria for housing site options (14kb) should be read as part of the consultation.
| Evidence Base: Published |
The Employment Land Review, approved Feb 2006, was done to
help preparation of the LDF and includes:
Download the Executive
Summary (196kb) or the full Employment
Land Review (1.1Mb), its Appendices
(with site maps)(3.7Mb) and its Cabinet
Member Report (46kb).
For more on this contact Tracey Rathmell: (Tel: 01423
556588).
Housing Needs Survey: Housing
Needs Assessment (May 07) (857kb), Executive
Summary (76kb) (background documents to the Core
Strategy) For more on this contact the planning
Policy Team: (Tel: 01423 556586).
|
| ARCHIVE: |
Sustainability
Appraisal Scoping Report (356kb) October 2005. The consultation
period ended on 2 December 2005.
Urban Housing Capacity Study: March 2005. For more on this contact Simon Hartley: (Tel: 01423 556584). Housing Needs Survey 2002/03. For more on this contact the planning Policy Team: (Tel: 01423 556586). Workshops: Growth of Settlements Notes (Spring 2005) Core Strategy/Major Allocations Issues Consultation (Summer 2004)(560kb) For more on this contact Rachael Hutton: (Tel: 01423 556578). |
| For more on this contact: Simon Hartley (Tel: 01423 556584) or email: ldf@harrogate.gov.uk | |