New Ripon pool and leisure centre project

Due to be completed in November, the multi-million-pound investment project at Ripon Leisure Centre will provide a new state-of-the-art facility with:

  • a six-lane 25 metre pool
  • a new main entrance, lobby and changing rooms
  • a new health suite
  • two new dance studios and spin studio
  • new £100,000 play area

Key project updates:

  • the gym has moved and can now be accessed via the temporary entrance
  • the new swimming pool is currently being installed
  • installation of drainage and levelling of the field to allow for the football pitch and car park
  • created a temporary car park, footpath and entrance at the rear of the building, accessed from Knaresborough Road